Custom Branding · Joy's walkthrough for Max · updated Monday, July 13, 2026 · weekly via marketing-throughput-weekly.

Per Max 6/8/2026 — verbatim: "custom branding. dumb this way down."

📊 This month (July 2026) vs last month (June 2026)

July MTD June (full) Δ
Completed (Sent to Ops / Dielines Signed) 11 — stamped thru 7/10 (13 days in) 34 on pace — tracking ~June rate
New top-level projects (in) 5 24 intake slower than June 🟢
Open queue (full board read) 124 — fresh full Chrome scroll 7/13 137 (7/6) · 111 (6/22) −13 🟢 vs 7/6

The one number that matters: open queue = 124 — down 13 since last week's read (137 on 7/6). First real drawdown in weeks: the team shipped 12 top-level projects in the last 14 days while only ~9 new top-level requests came in, so the backlog finally shrank instead of growing. Ship rate outpaced intake. Biggest open stages right now: Concepts sent to client (26), Dielines out for signature (21), Concepts sent to onboarding (15), Ops Request (15), Dielines in progress (14).

📋 Recent custom branding work (last 14 days)

Project Status Created Time to complete
Sandy Beach Vacation Properties Dielines Signed 7/7/26 3 days 🟢 fastest
Crashing Wave Rentals (943) Dielines Signed 6/25/26 15 days
Stay Salt Line Dielines Signed 6/4/26 35 days
Rise Collective – Paradiso Dielines Signed 4/22/26 70 days
Awayday – Stay Winter Park Sent to Ops 4/20/26 72 days
Blueberry Farms (Mentone Mountain Getaways) Dielines Signed 4/15/26 83 days
VRP Rentals Dielines Signed 4/9/26 83 days
PMI Big Tex (0792) Dielines Signed 12/15/25 207 days
DoneRight Management (0762) Dielines Signed 11/6/25 238 days
Joseph Ellen Properties (0713) Dielines Signed 9/22/25 288 days
Sand n Sea Dielines Signed 12/12/23 930 days
Bayley Vacations Dielines Signed 11/27/23 952 days (oldest backlog cleared)
Annabelle Lodging New 7/10/26 — new intake
Skyhaus Management New 7/7/26 — new intake
Kiva Dunes Revisions Requested 7/7/26 — in progress
VARE Properties New 7/2/26 — new intake

Caveat: Open total (124) = a full Chrome scroll of the board (https://www.notion.so/65a66c6562e643799fafd37d5127bfb5) — the connector caps at ≤25 rows and can't total the board. 12 top-level projects completed in the last 14 days (all shown above, plus the 4 newest intakes); completed counts count only items with a stamped "Completed" date, so they're a floor. Time-to-complete = Completed − Created (original request), which is why aged-backlog items show large numbers.